Say this

  1. Today's top hazard is on the board. Here is what could happen, and here are the controls we have put in place.
  2. The controls are not optional. If one is missing on site, the job is not safe to start.
  3. We rate each risk by how bad and how likely. Anything rated high does not go ahead until we bring it down.
  4. Removing the hazard beats any PPE. If you see a way to cut the hazard out of the job, tell me.
  5. Watch for changes: a new tool, a new chemical, rain, a new crew next to you. A change means we check the assessment again.
  6. Report near misses. Each one tells us the assessment missed something.
  7. If the job does not match the plan, stop and call me. Nobody will be blamed for stopping.

Ask the crew

  1. What is the biggest hazard in your task today?
  2. What control stops it from hurting you?
  3. What would make you stop the job and call me?
  4. Has anything changed since yesterday that we should add?

Show them

  • The risk assessment for today's task. Point to the high and medium rows.
  • One control on site that came from the assessment, such as a guard-rail or barricade.
  • Where to report a near miss.

Sign-off

Site: ______________________   Date: ____________   Briefed by: ______________________

NameCompanySignature

Sources

  1. Code of Practice on Workplace Safety and Health Risk Management (second revision), WSH Council.
  2. Conducting risk assessments, WSH Council.
  3. Risk management, Ministry of Manpower.

This is practical guidance, not legal advice. Laws and codes of practice change; always check the current official text and your site's own procedures.