Site: ______________________ Date: ____________ Checked by: ______________________
01Surveys and plan
02Permit and preparation
03Sequence and stability
04Machines and zones
05Debris and openings
06Public and access
Under Singapore's Construction Regulations 2007, demolition is high-risk construction work and needs a permit-to-work issued by the project manager. Supply lines are shut off and capped and exterior glass and cladding removed before work starts. Load-bearing parts come out to a professional engineer's method statement. Adjacent structures are kept stable, collapse zones are barricaded, and catch platforms protect people below exterior walls and roofs. MOM requires an asbestos survey before demolishing a building built before 1 January 1991.
Sources and further reading
- Workplace Safety and Health (Construction) Regulations 2007, Singapore Statutes Online (AGC).
- WSH Advisory: Demolition workplace fatal injuries in 2H2024, WSH Council.
- Technical Advisory for Demolition, WSH Council.
- When do I need to conduct an asbestos survey?, Ministry of Manpower.
This is practical guidance, not legal advice. Laws and codes of practice change; always check the current official text and your site's own procedures.