Say this

  1. We build exactly what the drawing shows. If a part is missing or does not fit, stop and tell the formwork supervisor. Do not swap in something else.
  2. Never take out a prop, brace or tie to make room. Ask first. Only the engineer can approve a change.
  3. Every shore sits on a sole plate or firm slab, and every adjustable prop is locked.
  4. No pour until the supervisor has checked it and the engineer has signed it off.
  5. During the pour, only the concreting crew stays near. Nobody stands under the deck.
  6. If you see a prop move, the deck sag or the ground sink, shout, stop the pour and get off.
  7. Strike only when you are told the concrete is ready. Bend over or pull out nails and ties as you go.

Ask the crew

  1. Who is our formwork supervisor today?
  2. What do you do if a prop is in the way of your work?
  3. Who can be near the formwork during the pour?
  4. What signs tell you the formwork is starting to fail?

Show them

  • Point out the bracing in both directions and the sole plates under the shores.
  • Show the drawing and how to check prop spacing against it.
  • Mark the exclusion zone for the pour and the safe place to watch from.

Sign-off

Site: ______________________   Date: ____________   Briefed by: ______________________

NameCompanySignature

Sources

  1. Workplace Safety and Health (Construction) Regulations 2007, Singapore Statutes Online (AGC).
  2. Advisory for professional engineers on formwork safety (January 2014), Ministry of Manpower.

This is practical guidance, not legal advice. Laws and codes of practice change; always check the current official text and your site's own procedures.